LDP163-181 Detachable System Control Box

    From ViewSonic User Guide Database

    Detachable System Control Box

    The System Control Box can be installed under the Cabinets (standard installation) for front access, or behind the Cabinets.

    LDP135-151 DSCB 1.png
    LDP135-151 DSCB 2.png
    Standard Installation Hidden System Control Box Installation
    NOTE:
    • Standard Installation video.
    • Follow the below guide to install the display with the Hidden System Control Box layout.

    Wall Mounting

    Installing the Upper and Lower Wall Mount Brackets

    LDP163-181 DSCB Wall Mount 1.png
    1. Ensure the wall area and size is an appropriate installation site.
    2. NOTE: The height of the Upper Wall Mount Brackets must not be less than 102 ²³/₆₄" (2600 mm) from the ground.
    3. Using the Wall Mount Bracket (pictured above) as a guide, mark at least eight (8) holes and pre-drill them.
    4. Install the first Upper Wall Mount Bracket with the provided screws (M6x50mm Expansion for masonry; TA6x30mm for load bearing wood).
    5. Repeat Step 2, ensuring the second Upper Wall Mount Bracket is level with the first upper bracket. Keep a 3 ¹¹/₃₂" (85 mm) space between the two brackets.
    6. LDP163-181 DSCB Wall Mount 2.png
    7. Install the Lower Wall Mount Brackets in the same manner as the Upper Wall Mount Brackets. The distance between the Upper and Lower Wall Mount Brackets is 66 ²⁷/₆₄" (1687.25 mm).
    8. LPD163-181 Wall Mounting Spacing.png
      NOTE: You can also install the Upper Wall Mount Brackets, hang the screen, and then install the Lower Wall Mount Brackets for a more precise fit.
      Icon Warn.svg
      Ensure the wall can safely support 423.29 lbs. (192 kg).
      Icon Warn.svg
      Ensure the deviation of wall surface must be < ¹³/₆₄" (< 5 mm).
    9. After installing both Upper and Lower Wall Mount Brackets, the installation wall should look like:
    10. LDP163-181 DSCB Wall Mount 4.png

    Installing the Cabinets

    1. Ensure the Mounting Brackets on the rear of the six (6) Cabinets are positioned at the top and bottom mounting positions as shown below:

    2. LDP163-181 Rear Panels Separate.png

    3. Carefully lift each Cabinet up onto the Upper Wall Mount Brackets starting from the left.

    4. LDP163-181 Wall Mounting After One Screen.png

    5. Ensure the Mounting Brackets sit securely on the Wall Mount Brackets as shown below.

    6. LD Wall Mount Close Up.svg

    7. Push each Locking Bolt and lock each Hook with the hex tool to securely connect each cabinet together. It may be necessary to align the hole with the hex tool in order to engage the Locking Bolt.

    8. LDP163-181 Wall Mounting Connecting Screens.png

      NOTE: There are six (6) Locking Bolts and 12 Hooks between each cabinet.
    9. Place the remaining Cabinets up onto the Upper Wall Mount Brackets. Install from left to right, ensuring the Mounting Brackets sit securely on the Wall Mount Brackets.
    10. Repeat Step 4, securing the Cabinets together with each Locking Bolt and Hook.

    11. LDP163-181 Wall Mounting All Screens.png
      NOTE: There are six (6) Locking Bolts and 12 Hooks between each cabinet.

    Connecting the System Control Box (Hidden Installation)

    1. Carefully unfold the System Control Box panel. Ensure the main system control board is on the right.
    2. NOTE: Use caution as the System Control Box panel is separated into two pieces with wires attached.
    3. Install the left part of System Control Box using the M6x16mm screws behind the Cabinet.
    4. LDP135-151 DSCB Install 1.png
    5. Install the right part of the System Control Box using the M6x16mm screws behind the Cabinet.
    6. LDP135-151 DSCB Install 2.png
    7. Connect the Network and Power cables of the Cabinets to the System Control Box.
    8. NOTE: There are six (6) Network and six (6) Power cables to connect.
      • Route the Power cable through the opening provided in the Cabinet and connect it to the power plug.
      LDP135-151 DSCB Net Power 1.png
      • Route the Network cable through the opening provided in the Cabinet into an “S-shape" and connect it to the network port.
      LDP135-151 DSCB Net Power 2.png
    9. Install the bezels from the bottom of the screen and use the M6x10mm screws to secure it to the Cabinet.

    Installing the LED Modules

    Icon Warn.svg
    Please wear Anti-Static Gloves before installing the LED modules.
    1. Install each LED Module onto the Cabinets, being sure to match the corresponding numbers on the Module to the Cabinet.
    2. LDP163-181 DSCB Install LED Modules 1.png
    3. Ensure each Module is flush and that there is little to no gap between each. It may be necessary to gently tap the module to make it flush.
    4. LDP163-181 DSCB Install LED Modules 2.png