LD135-151 Floor Stand Installation

From ViewSonic Documentation
Revision as of 07:26, 12 August 2020 by Rob.vsi (talk | contribs) (Created page with "<noinclude> {{Sticky_Menu_DirectView |1=LD135-151_Introduction |2=LD135-151_Remote_Control |3=LD135-151_Wall_Installation |4=LD135-151_Floor_Stand_Installation |5=LD135-151_Co...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Before Installation

  1. Maintain an adequate air gap between the back of the display and any wall for proper ventilation.
  2. Ensure there is no direct airflow from air conditioning or heating vents blowing on the display.
  3. Avoid installing the display in places with high humidity.
  4. Due to high power usage, always use power cords specifically designed for this product.

Floor Stand Installation

The floor stand is an optional accessory. Follow the below instructions to install your LED Display onto the stand.

Component List

Letter Item Quantity Description
A
1 Hex Tool
B
8 M6 x 80mm Bolt
C
1 Left Support
D
1 Bottom Cross Beam
E
1 Right Support
F
1 Top Cross Beam

Dimensions

Constructing the Floor Stand

Constructing the Floor Stand
  1. Connect the Left Support to the Bottom Cross Beam with two (2) M6 x 80mm bolts.
  2. Connect the Right Support with the Bottom Cross Beam with two (2) M6 x 80mm bolts.
  3. Connect the Top Cross Beam to the Left and Right Supports with four (4) M6 x 80mm bolts.
  4. NOTE: Ensure the groove of the Top Cross Beam faces inwards.
  5. Ensure all bolts are tightened properly.