tc: LD216-251 Wall Installation: Difference between revisions

From ViewSonic Documentation
Jump to: navigation, search
Line 48: Line 48:
</ol>
</ol>


==Installing the Middle Cabinets==
==安裝中間機櫃==
<ol>
<ol>
<li>Ensure the ''Mounting Brackets'' on the rear of the six (6) ''Middle Cabinets'' are positioned at the top and bottom mounting positions as shown below:</li><br />
<li>確保六 (6) 個中間機櫃後側的安裝架位於上下安裝位置,如下所示:</li><br />


<div class="res-img">[[File:LD216-251_Rear_Middle_Panels_Separate_Original.svg|400px]]</div><br />
<div class="res-img">[[File:LD216-251_Rear_Middle_Panels_Separate_Original.svg|400px]]</div><br />


<li>Carefully lift each ''Middle Cabinet'' up onto the Upper ''Wall Mount Brackets''.</li><br />
<li>小心地將各個中間機櫃抬到上壁掛架上。</li><br />


<div class="res-img">[[File:LD216-251_Wall_Mounting_After_Middle_Screens_Update.svg|400px]]</div><br />
<div class="res-img">[[File:LD216-251_Wall_Mounting_After_Middle_Screens_Update.svg|400px]]</div><br />


<li>Ensure the ''Mounting Brackets'' sit securely on the ''Wall Mount Brackets'' as shown below.</li><br />
<li>確保安裝架固定在壁掛架上,如下所示。</li><br />


<div class="res-img">[[File:LD_Wall_Mount_Close_Up.svg|400px]]</div><br />
<div class="res-img">[[File:LD_Wall_Mount_Close_Up.svg|400px]]</div><br />


<li>Push each ''Locking Bolt'' and lock each ''Hook'' with the hex tool to securely connect each cabinet together.</li><br />
<li>推入鎖定螺栓並用六角工具鎖緊鉤子,將機櫃牢牢連接在一起。</li><br />


<div class="res-img">[[File:LD216-251_Wall_Mounting_Connecting_Middle_Screens.png|500px]]</div><br />
<div class="res-img">[[File:LD216-251_Wall_Mounting_Connecting_Middle_Screens.png|500px]]</div><br />


:'''NOTE:''' There are eight (8) Locking Bolts and 16 Hooks between each cabinet.
:'''備註:''' 每個機櫃之間有八 (8) 個鎖定螺栓和 16 個鉤子。


<li>Lift the remaining ''Middle Cabinets'' up onto the Upper ''Wall Mount Brackets'', ensuring the ''Mounting Brackets'' sit securely on the ''Wall Mount Brackets''.</li>
<li>將其餘的中間機櫃抬到上壁掛架上,確保安裝架固定在壁掛架上。</li>


<li>Repeat '''Step 4''', securing the cabinets together with each ''Locking Bolt'' and ''Hook''.</li><br />
<li>重複步驟 4,透過鎖定螺栓和鉤子將機櫃固定在一起。</li><br />


<div class="res-img">[[File:LD216-251_Wall_Mounting_After_Middle_Screens.svg|400px]]</div>
<div class="res-img">[[File:LD216-251_Wall_Mounting_After_Middle_Screens.svg|400px]]</div>

Revision as of 08:25, 25 March 2021

安裝前

  1. 請在顯示器背面與任何牆壁之間,保留足夠的氣隙以確保適度通風。
  2. 確保沒有來自空調或暖氣通風口的直接氣流吹向顯示器。
  3. 避免將顯示器安裝在高濕度場所。
  4. 由於功耗高,請務必使用專為本產品而設計的電源線。

壁掛

安裝上下壁掛架

  1. 確保牆壁面積和大小適合安裝。
  2. 備註: 上壁掛架的離地高度,不得小於 129.92"(3.3 公尺)。
  3. 以壁掛架(上圖)為基準,標記八 (8) 個孔並預先鑽孔。
  4. 使用隨附的螺絲(M6x50mm 膨脹螺絲用於石材;TA6x30mm 用於承重木材)安裝第一個上壁掛架。
  5. 重複步驟 2,確保第二個上壁掛架與第一個上架齊平。


  6. 安裝下壁掛架,方式與上壁掛架相同。上下壁掛架之間的距離為 103.94" (2640 mm)。


  7. 確保牆壁可安全地支撐 749.57 lbs. (340 kg)。
    備註: 您也可以安裝上壁掛架,懸掛螢幕,然後安裝下壁掛架以便更精準地安裝。
  8. 安裝上下壁掛架後,安裝牆應如下所示:

安裝中間機櫃

  1. 確保六 (6) 個中間機櫃後側的安裝架位於上下安裝位置,如下所示:


  2. 小心地將各個中間機櫃抬到上壁掛架上。


  3. 確保安裝架固定在壁掛架上,如下所示。


  4. 推入鎖定螺栓並用六角工具鎖緊鉤子,將機櫃牢牢連接在一起。


  5. 備註: 每個機櫃之間有八 (8) 個鎖定螺栓和 16 個鉤子。
  6. 將其餘的中間機櫃抬到上壁掛架上,確保安裝架固定在壁掛架上。
  7. 重複步驟 4,透過鎖定螺栓和鉤子將機櫃固定在一起。

Installing the Left and Right Cabinet

  1. Ensure the Mounting Brackets on the rear of the Left and Right Cabinet are positioned at the top and bottom mounting positions as shown below:


  2. Carefully lift the Left and Right Cabinet up onto the Upper Wall Mount Brackets, ensuring the Mounting Brackets sit securely on the Wall Mount Brackets.


  3. If necessary, adjust the Left or Right Cabinet so that they fit seamlessly with the Middle Cabinets.
  4. Push each Locking Bolt and lock each Hook with the hex tool to securely connect the Left and Right Cabinets.

  5. NOTE: There are eight (8) Locking Bolts and 16 Hooks between each cabinet.

Connecting the System Control Box

  1. Carefully unfold the System Control Box panel. Ensure the main system control board is on the left.
  2. NOTE: Use caution as the System Control Box panel will be separated into two pieces, however the wires are connected.
  3. Align the holes of the Cabinet with the System Control Box to attach.


  4. Further secure the System Control Box to the Cabinets with the 32 provided screws (M6x16mm).


  5. Connect the Network and Power cables of the Cabinets to the System Control Box.
  6. NOTE: There are four (4) Network and eight (8) Power cables to connect.

Installing the LED Modules

Install each LED Module onto the Cabinets, being sure to match the corresponding numbers on the Module to the Cabinet.

Please wear Anti-Static Gloves before installing the LED modules.


Ensure each Module is flush and that there is little to no gap between each.

Installing System Control Box Covers

There are three (3) System Control Box Covers: Left, Middle, and Right.

  1. Begin by installing the Right Cover onto the System Control Box.
  2. NOTE: Ensure the Power Button cable is connected to the System Control Box Power cable before securing the Cover.
  3. After connecting the Power Button cable, ensure the Right Cover is properly aligned with the System Control Box; then secure it with the 18 provided screws (KM3x6mm).
  4. Repeat the above steps for the Middle and Left Cover.
  5. Your display is now ready for use.

Video Overview